Commercial Case Studies
Pugliese Contracting Corporate Headquarters – Windham, MA Pugliese Contracting Corp. completes construction of new 8,000 s/f green corporate headquarters. As a full service self-performing general contractor specializing in interior fit-ups, Pugliese Contracting showcased its many talents in this construction of this new ground up “green” building.
Merrimack County Nursing Home (MCNH) – Boscawen, NH Geothermal Think Tank Takes on an Extraordinary Job – Sixteen 1500′ wells feed 326 water-to-air heat pumps, providing a total of 615 tons of capacity. In service since 2008.
Chewonki Geothermal Retrofit Geothermal Energy The heat beneath our feet!
South Cove Activity Center – Grantham NH 16,000 Square Foot Building, with Pool – new construction. Installed and fully operational in July 2009.
Gustavo Preston – Chelmsford, MA 11,000 Square Foot Building – New Construction. Installed and fully operational in June 2008.
Haverhill Public Library – Haverhill MA 44,000 Square Foot Building – retrofitted. Average 2008-2009 $1.79/sq. Ft. Heating, Cooling, All Electric Lights, Computers, Equipment and Services Installed and fully operational in January 1995.
Rivers Edge Apartments – Durham NH 42,000 SquareFtBuilding – New Construction. Installed and fully operational in July 2009.
Two C Pack Corp – Nashua, NH Eight 1,500 ft standing column wells with a load size of 300 tons for process cooling high-quality printing equipment.
Water Energy Starwoood Office – The Geo Barn – Hampstead, NH Total building operation cost including computers, lights, heating, air conditioning, water pumping and hot water is $1.23 per square foot. Comfort on even the coldest day is great.
Atkinson Town Hall – Atkinson, NH “We’re saving a lot over fossil fuel and happy with the excellent comfort.” D. Weymouth
Gilford Public Library – Gilford, NH Two 1,300 ft Standing Column Wells provide complete heating and air conditioning.
Gilford Municipal Building – Gilford, NH Retrofit of existing building for police station addition.
Elsie A Hastings Elementary School – Westborough, MA Six Standing column wells for twenty ten ton Climatemaster geothermal heat pumps. Located 1/4 mile from Town water wells.
North Adams Public Library Library built ~1900, upgraded with new wing. Entire building is 100% heated, cooled and dehumidified with Geothermal.
New Hampshire DHHS – Nashua, NH This was a rehab project of old river-side mill, with three standing column wells, 1,500 ft each.