Commercial Case Studies
Pugliese Contracting Corporate Headquarters – Windham, MA
Pugliese Contracting Corp. completes construction of new 8,000 s/f green corporate headquarters. As a full service self-performing general contractor specializing in interior fit-ups, Pugliese Contracting showcased its many talents in this construction of this new ground up “green” building.Merrimack County Nursing Home (MCNH) – Boscawen, NH
Geothermal Think Tank Takes on an Extraordinary Job – Sixteen 1500′ wells feed 326 water-to-air heat pumps, providing a total of 615 tons of capacity. In service since 2008.Chewonki Geothermal Retrofit
Geothermal Energy The heat beneath our feet!South Cove Activity Center – Grantham NH
16,000 Square Foot Building, with Pool – new construction. Installed and fully operational in July 2009.Gustavo Preston – Chelmsford, MA
11,000 Square Foot Building – New Construction. Installed and fully operational in June 2008.Haverhill Public Library – Haverhill MA
44,000 Square Foot Building – retrofitted. Average 2008-2009 $1.79/sq. Ft. Heating, Cooling, All Electric Lights, Computers, Equipment and Services Installed and fully operational in January 1995.Rivers Edge Apartments – Durham NH
42,000 SquareFtBuilding – New Construction. Installed and fully operational in July 2009.Two C Pack Corp – Nashua, NH
Eight 1,500 ft standing column wells with a load size of 300 tons for process cooling high-quality printing equipment.Water Energy Starwoood Office – The Geo Barn – Hampstead, NH
Total building operation cost including computers, lights, heating, air conditioning, water pumping and hot water is $1.23 per square foot. Comfort on even the coldest day is great.Atkinson Town Hall – Atkinson, NH
“We’re saving a lot over fossil fuel and happy with the excellent comfort.” D. WeymouthGilford Public Library – Gilford, NH
Two 1,300 ft Standing Column Wells provide complete heating and air conditioning.Gilford Municipal Building – Gilford, NH
Retrofit of existing building for police station addition.Elsie A Hastings Elementary School – Westborough, MA
Six Standing column wells for twenty ten ton Climatemaster geothermal heat pumps. Located 1/4 mile from Town water wells.North Adams Public Library
Library built ~1900, upgraded with new wing. Entire building is 100% heated, cooled and dehumidified with Geothermal.New Hampshire DHHS – Nashua, NH
This was a rehab project of old river-side mill, with three standing column wells, 1,500 ft each.