NORTH ADAMS PUBLIC LIBRARY
Earth Coupling Type: Standing Column
Size of Building: 40,000 Square Feet
Size of Load: 100 Tons
HVAC Installer: Dobbert Heating & A/C, North Adams
MORE INFORMATION:
- Library built ~1900, upgraded with new wing. Entire building is 100% heated, cooled and dehumidified with Geothermal.
- Original design was three Standing Columns, exceptionally high yield and existing storm drain allowed reduction to two SCW.
- Engineer, Best & Joslin
- General Contractor, Soulier & Zenka, Adams, MA